Gas steam generator Shinagawa SB-1
ManufacturerShinagawa Machinery WorksPOTENCIAL PC LTDPOTENCIAL PC LTDPOTENCIAL PC LTD
ModelSB-1———
Manufacturer countryJapanRussiaRussiaRussia
Equipment typeCooking kettleCooking kettleCooking kettleCooking kettle
Throughput, kg/h20151515
Volume, L—112511
Power, kW—12312
Heater type—ElectricElectricElectric
Steam output—15 kg/h15 kg/h15 kg/h
Working pressure—0.55 MPa0.55 MPa0.55 MPa
Boiler configuration—Standard boilerStandard boilerStainless steel boiler
Power consumption—12 kW3 kW12 kW
Power supply—380 V, three-phase, 50 Hz380 V, three-phase, 50 Hz380 V, three-phase, 50 Hz
Heat-up time to working pressure at maximum output—4 min12 min4 min
Boiler volume, maximum—11 L25 L11 L
Overall dimensions (L × W × H)—400 × 380 × 650 mm560 × 565 × 880 mm400 × 380 × 650 mm
Dry weight, maximum—45 kg85 kg45 kg
Water30 L———
Coefficient of the table20 kg/h———
Dimensions (W × L × H)660 × 655 × 770 mm———
Weight66 kg———
Liquefied gas flow rate1.2 kg/h———

Pairwise comparison summaries

Potencial PEE-15M electric electrode steam generator (0.55 MPa, standard boiler) and Potencial PP-15 steam superheater (0.55 MPa, standard boiler)

  • Throughput. The stated value is 15 kg/h for both models.
  • Volume. Potencial PP-15 steam superheater (0.55 MPa, standard boiler) has the larger stated volume (25 L). The stated value for Potencial PEE-15M electric electrode steam generator (0.55 MPa, standard boiler) is 11 L.
  • Power. Potencial PEE-15M electric electrode steam generator (0.55 MPa, standard boiler) has the higher stated power (12 kW). The stated value for Potencial PP-15 steam superheater (0.55 MPa, standard boiler) is 3 kW.
  • Heat-up time to working pressure at maximum output. Potencial PEE-15M electric electrode steam generator (0.55 MPa, standard boiler): 4 min. Potencial PP-15 steam superheater (0.55 MPa, standard boiler): 12 min.

If volume is your priority, Potencial PP-15 steam superheater (0.55 MPa, standard boiler) has the larger stated capacity. Confirm the working load for your product.

Potencial PP-15 steam superheater (0.55 MPa, standard boiler) and Potencial PEE-15M electric electrode steam generator (0.55 MPa, stainless steel boiler)

  • Throughput. The stated value is 15 kg/h for both models.
  • Volume. Potencial PP-15 steam superheater (0.55 MPa, standard boiler) has the larger stated volume (25 L). The stated value for Potencial PEE-15M electric electrode steam generator (0.55 MPa, stainless steel boiler) is 11 L.
  • Power. Potencial PEE-15M electric electrode steam generator (0.55 MPa, stainless steel boiler) has the higher stated power (12 kW). The stated value for Potencial PP-15 steam superheater (0.55 MPa, standard boiler) is 3 kW.
  • Heat-up time to working pressure at maximum output. Potencial PP-15 steam superheater (0.55 MPa, standard boiler): 12 min. Potencial PEE-15M electric electrode steam generator (0.55 MPa, stainless steel boiler): 4 min.

If volume is your priority, Potencial PP-15 steam superheater (0.55 MPa, standard boiler) has the larger stated capacity. Confirm the working load for your product.

Request a quote

Country

Cehmash stores your request. Only the catalogue administrator can view your contact details.

Request supplier quotes

Send one request to all selected companies. Replies appear in your account. Suppliers cannot see your email or phone number.

Equipment requested

Loading…

Recipients
Delivery country