1. Home
  2. Compare

Compare models

View summary
Highlighted rows show differences
Torrey CHTC-145 13 ft³ dual-mode chest freezer
Industrial billiers
ManufacturerTorreyTecnopool-RZHEJIANG GUANFENG FOOD MACHINERY CO. LTDAGRO-PROM-HOLOD
Manufacturer countryMexicoRussiaChinaRussia
Equipment typeRapid freezerRapid freezerRapid freezerRapid freezer
Throughput, kg/h——5,000—
Power, kW——245—
SKUCCCHS145020———
Cabinet volume13 ft³———
Operating modesRefrigeration and freezing———
Container roll-over, for loading into the technology line reception bunker—1——
Truck, wash and reception bunker transporter—1——
Car wash—1——
Bath-room discharge truck—1——
root-cleaning machine—1——
Product inspection transporter—1——
The Corneberry Cut "Lomtic, Stolbik, Cube"—1——
Blanshire of vegetables with transshipment line to chiller—1——
Vegetable cooler after blanche—1——
Wagon decoupling transporter—1——
Vibration transporter—1——
Sulphation machine—1——
TECNO-FLU fluidizer—1——
Refrigerated compressor-condensing unit—1——
Product—Ratio——
Green peas—1——
Beans (cut 15-30 mm)—0,85——
Corn (40-50 mm in kidneys)—0,3——
Corn (grain)—0,95——
Colour cabbage (20-50 mm)—0,7——
Asparagus (cut 25 mm)—0,7——
Green peppers (cut by pieces)—0,6 - 0,75——
Tomato (integral ~ 30 mm)—0,4——
Mushrooms (integral 10 mm)—0,6——
Carrots (10 mm cubes)—0,8——
Potatoes ( 10 mm cubes)—0,8——
Smodden red, black—0,75——
Grapes ( ≤ 20 mm)—0,7——
The redhead.—0,7——
Cherries (with bones)—0,7——
Malina—0,5——
Strawberries ( ∙ 25 - 35 mm)—0,7——
Plum (knock)—0,6——
Strawberry and mango productivity——5 000 kg/h—
Duration of freezing——12–60 min—
Temperature at the centre of product at outlet——−18 °C—
Air temperature of the chamber——−33 ± 2 °C—
Belt width——1 250 mm—
Dimensions——31.5 × 4.3 × 4.16 m—
Category Parameter——Details of specific parameters—
Processing Capacity——5000 Kg / h (for strawberry,mango dices )—
Dimension of Quick-Freezer Freezing Chamber——Length 29.5m × Width 4.3m × Height 4.03m—
Overall Dimension of Quick-Freezer——Length 31.5m × Width 4.3m × Height 4.16m—
Freezing time——12-60min (adjustable via frequency conversion)—
Flow temperature——+25 °C—
Temperature of the unloading centre——-18 °C—
Air Temperature in Freezing Chamber——-33±2 °C—
Width of conveyor tape——1250 mm—
Conveyor Belt Reduction Motor——Equipped with frequency conversion speed regulation; 2 reducers in total—
Special Quick-Freezing Centrifugal Fans——17 sets in total (with high wind pressure, anti-vibration design)—
Mesh Belt Vibration Chain Device——13 sets in total, each controlled independently—
Complete aluminium evaporators——Total 6 sets—
Mesh Belt Cleaning and Drying Device——1 set—
Cooling Capacity Required for Quick-Freezing——840 kW (working state: +35 °C/-42 °C)—
Method of defrosting——Water washing, defrosting—
Installed power——245.0 kW—
Host———Intended use
Compressor———Compresses coolant vapours, increasing pressure and temperature
Capacitor———He heats the refrigerant with air or water, the coolant moves to liquid phase
Extension valve (VET, ERT)———Reduces the refrigerant pressure before the evaporator and controls its delivery
Evaporator———Plastic or housing heat exchanger where water or glycol is cooled
Hydromodulosis———Pump, expansion tank and buffer — serve cooled liquid to consumers
Dryer filter, piping———Protect the contour from moisture and contamination
Automatics———Control keeps the temperature set, protects against freezing, overloading, loss of flow
Parameter———Why Important
Refrigeration capacity, kW———Main parameter: The heat load of the equipment or the flow and temperature difference of the liquid is considered as a function of the heat load of the equipment.
Liquid temperature at inlet and exit———Standard mode +12/+7 °C; for ice water and glycol, separate selection of compressor and evaporator
Type of coolant———Water, ethylene glycol or propylenglikol (for food production) Glycol reduces productivity by 5-15%
Type of capacitor———Air, water or sloppy — depending on the location, power and water contour
Position and climate———Street, roof or room; maximum summer and minimum winter air temperature
Operating mode———Continuous or shift operation and year-round or seasonal operation determine the choice of free cooling and redundancy.
Dimensions and noise level———Size of site, service passageway, noise limits near work places
Energy Efficiency (EER)———Determines the cost of electricity over the life cycle — often more important than the price of purchase
Work———Periodicity
Visual inspection, operation and accident log———Monthly
Cleaning of capacitor heat exchangers, filter verification———Quarterly
Control of refrigerant filling, leak search———Every six months
Electrical inspection, automation, glycol concentration———Annually

Pairwise comparison summaries

Request a quote

Country

Cehmash stores your request. Only the catalogue administrator can view your contact details.

Request supplier quotes

Send one request to all selected companies. Replies appear in your account. Suppliers cannot see your email or phone number.

Equipment requested

Loading…

Recipients
Delivery country